Grading, Bituminous Surfacing, Bituminous Mill & Overlay, Temporary Signals on Th55 in Dakota County Near Doyle Path
Taxiway S Reconstruction – MSP International Airport
Removed and replaced 3/4 of a mile of airport taxiway. Performed job with the utmost safety and security due to the location of the work.
Interstate 35E & HWY 36 Exit Ramp
Reconstructed HWY 36 EB Exit Ramp to improve traffic flow. Graded ramp to allow for increased travel speeds. Installed geofoam block under grade for use as lightweight fill.
Academy of Holy Angels Turf Field
Graded and constructed site for new turf field installation at Academy of Holy Angels. Added drainage culverts and underground piping.
Thompson Lake Sediment Removal & Soil Correction
Mass soil correction due to the contaminated soil onsite. Used shoring techniques to prevent soils for draining back into dredged pond. Placed concrete structures for water main systems.
Central Gym Park Minneapolis
Owner: Minneapolis Park & Recreation Board Landscape Architect: Damon Farber Scope of Work: Remove existing concrete walk and playground equipment, install storm chamber system, reshape and grade playground area, grade basketball court and multipurpose field
Southview Middle School Bus Loop
Excavated thousands of cubic yards of dirt to place deep storm chamber system beneath subgrade. Graded and replaced existing sidewalk and entryway area. This was a time-sensitive project that was substantially completed before children returned to school after summer break.
Holman Field Pavement Reconstruct (Saint Paul Downtown Airport)
Owner: Metropolitan Airports Commission Total reconstruct of 2 airport runways
- Page 1 of 2
- 1
- 2