Removed and replaced 3/4 of a mile of airport taxiway. Performed job with the utmost safety and security due to the location of the work.
Taxiway S Reconstruction – MSP International Airport
![](https://maxsteininger.net/wp-content/uploads/2019/02/IMG_20180718_141233-1204x903.jpg)
Removed and replaced 3/4 of a mile of airport taxiway. Performed job with the utmost safety and security due to the location of the work.